山东省胜利油田沙营污水厂改扩建工-飞禽走兽游戏机

 common problem


 common problem

山东省胜利油田沙营污水厂改扩建工


    山东省胜利油田沙营污水厂改扩建工

project name: reconstruction and expansion of shaying sewage plant in shengli oilfield, shandong province

project time: july 2004

the use of technology: primary sedimentation tank, two non-clogging aerated biological filter (baf)

technical advantages: power consumption reduced by 40%, drug consumption decreased by 30%, sludge production decreased by 60%, floor space reduced by 50%, the total residence time reduced to 6-8h, reducing investment costs, effluent quality to meet emission standards.






上一个:{aspcms:next}下一个:{aspcms:prev}
qr code
qr code
网站地图