中国石化广州分公司制水供水项目


    中国石化广州分公司制水供水项目

project name: china petrochemical guangzhou branch water supply project

project time: july 2010

the use of technology: high-density clarifier pool, flap filter

technical advantages: the effluent quality reaches below 0.3ntu, the processing capacity is increased by more than 30%, the filter operation period is 36-72 hours, the backwashing water consumption is reduced to below 1.5% of daily output, fully automatic operation and low investment cost.